Robert and Son Paving
Robert and Son Paving
Call (410) 924-4174

Parking Lot Striping in Federalsburg, MD

Lines do more than tidy a lot up. They decide how many cars fit, where traffic goes, and whether your accessible stalls are actually usable.

  • Stalls, arrows, stencils and fire lanes
  • Accessible stalls laid out to the standard
  • Residential and commercial for three generations
Call (410) 924-4174 Free Estimate

Get your free estimate

Enter your information below

Third GenerationOne Family
MHIC #74385BBB A+ Accredited
Two Year WarrantyOn All Work
Free EstimatesNo Obligation

Parking lot striping

A lot works or it does not, and the paint decides

Faded lines cost you parking. Drivers spread out, the aisle gets tight, and the corner that held two cars now holds one. Fresh lines put those spaces back and make the lot read at a glance, day or night.

Robert and Son Paving has laid out and striped lots on the Eastern Shore for three generations. Third generation, MHIC #74385, BBB accredited since 2018. We stripe lots we paved and lots we have never touched.

Paint is the last step, so a tired lot gets the holes and soft spots fixed first, then the seal, then the lines.

How a lot gets laid out

On a re-stripe we usually follow the layout that is there, since the old lines are still readable and your customers already know it. On new asphalt or a redesign it starts with a tape measure and a chalk line. A standard stall runs about nine feet wide and eighteen deep, with a drive aisle wide enough to back out in one move, wider where trucks turn. Angled stalls fit more cars on a narrow lot, but they only work one way, so the arrows have to agree with them. We chalk the whole thing and walk it with you before any paint goes down, which is the same care we put into the paving underneath.

What about ADA accessible stalls?

Any lot open to the public needs accessible stalls, and the number goes up with the size of the lot. Each one needs a marked access aisle beside it so a door or a ramp has room to open. Van accessible stalls need a wider aisle again, plus a sign that can be seen with a car parked in the space. Those stalls also belong on the shortest route to the door, on ground that is close to flat. The federal standards are published at ADA.gov, and we lay out the stalls, the aisles and the symbols to match them.

Sharp lines, more stalls, safer traffic

Free estimates on parking lot striping, arrows, stencils and accessible stalls across the Eastern Shore.

Call (410) 924-4174

What paint do you use and how long does it last?

Traffic paint made for asphalt, put down at a proper film thickness rather than a thin pass that looks fine wet and is gone by spring. Fresh asphalt gets two coats, because newly laid pavement drinks the first one. On a lot that needs more than paint, parking lot repair comes first. On a normal business lot, lines hold up one to two years before they start to fade, sooner in the drive aisles and at the entrance where tyres scrub. Paint also lasts far longer on a sealed surface than a raw one, so most lots get sealed and striped on the one visit.

When can a new lot be striped?

New asphalt wants about 30 days before it takes paint or sealer. The mix has to cure and give off its oils, and paint over green asphalt lifts and smears. If a business has to open sooner, we can put down a temporary layout and come back for the permanent lines once the surface is ready. Re-stripes are simpler. We sweep and blow the lot, chalk anything that has moved, then paint on a dry day with no rain in the forecast for a few hours. We stripe lots around Federalsburg, across to Cambridge and in the towns between.

Ask a paving contractor

Straight answers about asphalt paving on the Eastern Shore

How long does striping take to dry?

Traffic paint is usually dry to walk on within an hour and ready for cars in a few hours, depending on heat and humidity. We cone off sections so part of the lot keeps working while the rest dries.

Can you stripe over faded old lines?

Yes, that is most of what we do. We sweep the lot, follow the layout that is already there, and put fresh paint over the old lines so nobody has to relearn the parking.

Do you paint arrows, numbers and no parking areas?

We do. Directional arrows, stop bars, numbered stalls, no parking hatching, loading zones and fire lane markings are stencil work, and they go down on the same visit as the stalls.

How many accessible stalls does my lot need?

It depends on the total number of stalls, and the federal standard sets it out on a sliding scale. We count your lot, then lay out the accessible stalls, access aisles and signage to match.

Should I sealcoat before striping?

Yes, in that order. Sealer covers the whole surface and would bury fresh paint. We seal, let it cure, then chalk and stripe, which gives the paint a clean surface to grip onto.

Do you stripe churches and small business lots?

Yes, plenty of them. We work residential and commercial across the Shore, and a small lot is usually a single morning, often on a weekday when the property is quiet.

More of what we lay

Other asphalt paving work we handle

Parking Lot Repair

Failed lanes, dumpster pads and soft spots cut out and rebuilt, rather than skimmed over so they come back.

Learn More

Driveway Repair

Cracks, holes and broken edges put right so a sound driveway gets years more out of the surface it has.

Learn More

Topsoil and Fill Dirt

Screened topsoil and clean fill delivered and placed, to raise low ground or finish off after work is done.

Learn More

Also serving Easton and Cambridge from our yard in Federalsburg.

Free Estimate Call Now